GLOSSARY TERM  
  Negligence  
 
  DESCRIPTION  
  A cause of action in Tort that must consist of three elements namely: a Duty of Care; a breach or contravention of that duty; and a measurable loss or material damage flowing from or as a consequence of the breach of the duty.