GLOSSARY TERM  
  Drawings  
 
  DESCRIPTION  
  The documentation used to convey the design or technical details for construction purposes. Drawings may be part of the Contract Documents (such as architectural and service drawings) or for coordination between trades (such as Shop Drawings).