GLOSSARY TERM  
  Linen Plan  
 
  DESCRIPTION  
  The original document prepared by a surveyor which details the subdivision of land or the creation of instruments such as an Easement over land. The document is lodged at the NSW Land and Property Information. The paper used for this original document has a linen-like texture, hence the term 'linen plan'.